CSIC Phase one project work is covered by the case studies below. Please click the links for more information or to download the case studies as PDFs.
Auto generation of BIM models for infrastructure assets
Royal Mail Tunnel - Liverpool Street, project in collaboration with Crossrail: CSattAR photogrammetric Modelling to download the case study click here
UtterBerry Wireless Sensors for Infrastructure Modelling
Vibration Energy Harvesting to Power Sensors
Structural Monitoring using Laser Scanners
Geospatial Monitoring of Road Surfaces to download this case study click here
National Grid's London Power Tunnels to download this case study click here
Rail Bridge Monitoring Staffordshire
Distributed Temperature and Strain Sensing of Foundations
Continuous Strain Sensing of piles using O-cell
Measuring Impact Heating and Cooling on Piles
Assessing Pile Foundations for Reuse at Bevis Marks, London to download the case study click here
Value Based Infrastructure Asset Management to download the case study click here
Value Based tunnel repair strategy for London Underground to download the case study click here
Taking a value based approach to bridge maintenance to download the case study click here
Infrastructure futureproofing tool and Liverpool Wastewater Treatment Works to download the case study click here