Projects & case studies Projects & case studies overview DC2 Digital Cities for Change Risk-informed bridge management Bringing buildings to life – smart infrastructure at the Civil Engineering Building Inside concrete Closing the loop: back analysis of sprayed concrete tunnel junctions Construction's ongoing journey to net zero 2020 Case studies 2019 Case studies 2018 Case studies 2017 Case studies 2016 Case studies Monitoring and modelling of dynamic strain of railway bridges using fibre optic sensor networks and BIM Integration of sensing technologies in the London Bridge Station Redevelopment Project CSIC and Cementation Skanska - when project collaboration becomes commercial reality Futureproofing and safeguarding heritage structures through sensing Multi-dimensional simulation of underground spaces coupled with geoenergy systems 2015 Case studies 2014 Case studies CSIC partners with Cementation Skanska to develop CemOptics CSattAR deployment case study Continuous strain sensing using fibre optics on piles Fibre optic sensing innovations on Crossrail Fibre optic strain sensors for structural health monitoring Futureproofing and safeguarding heritage structures through sensing Monitoring storm water inflow in a foul sewer using distributed fibre optic temperature sensing New vibration energy harvester powers-up on Forth Road Bridge Road mapping sensors Smart tunnel case study Utterberry deployment case study Vibration energy harvesting 2016 Case studies 2016 Case Studies